大型水泥浮雕 冬季施工注意事項?冬季來臨,伴隨著冰凍和雨雪天氣的到來,冬季大型水泥雕塑施工有哪些注意事項呢?
What should we pay attention to in winter construction of large-scale cement sculpture? With the coming of winter, with the arrival of freezing and snow weather, what precautions should be taken in the construction of large-scale cement sculptures in winter?
1、大型水泥浮雕工程冬期施工時,所使用的水泥砂漿應采取保溫防凍措施,如摻外加劑時,其摻量應由實驗室試驗確定。
1. During the winter construction of large-scale cement sculpture project, the cement mortar used should adopt the measures of heat preservation and frost protection. For example, when admixtures are added, the amount of admixtures should be determined by laboratory tests.
2、在進行室內大型水泥雕塑施工前,應將洞口和窗口封好,門口和窗口的邊緣及外墻腳手眼或空洞等亦應堵好,施工洞口、運料口及樓梯間等處應封閉保溫,室內抹灰的環境溫度不應低于5°C;室內水泥砂漿工程結束后,在7d以內,應保持室內溫度不低于5°C.。
2. Before the construction of large-scale indoor cement sculpture, the entrance and window should be sealed, the edge of the entrance and window, the foot, eye or hole of the external wall should be blocked, the construction entrance, entrance and stairwell should be sealed and insulated, and the ambient temperature of indoor plastering should not be lower than 5 degrees C; after the completion of indoor cement mortar project, the indoor temperature should not be lower than 5 degrees C. After 7 days, the indoor temperature should be maintained.
3、大型水泥雕塑工程水泥砂漿面層不得在雨雪天施工,當施工中途下雨、下雪時應采取遮蓋措施,如加草簾覆蓋防止冰凍。
3. Cement mortar surface layer of large-scale cement sculpture Engineering should not be constructed in rainy and snowy days. Covering measures should be taken when it rains or snows in the middle of construction, such as adding straw curtain to prevent freezing.
4、在室內大型水泥雕塑的施工中,當溫度低于5°C時,可加設火爐(需有良好排煙或采用無煙燃料)或碘鎢燈適當加溫,但必須指定專人值班,備有相應消防器材,并密切注意防止煤氣中毒和火災的發生。
4. In the construction of large-scale indoor cement sculpture, when the temperature is below 5 degrees C, a stove (with good smoke exhaust or smokeless fuel) or a tungsten iodide lamp can be set up to warm appropriately, but a special person must be appointed on duty, equipped with appropriate fire-fighting equipment, and pay close attention to preventing gas poisoning and fire.
5、施工人員安全設施到位,安全帶、安全帽一應安全設施到位。為防止施工人員的摔傷,需安排專職看護人員。對于大型水泥雕塑工程,涉及高空作業的,需要穿戴專業的安全套裝。
5. Safety facilities for construction personnel should be in place, and safety belts and safety hats should be in place. In order to prevent construction personnel from falling, full-time caregivers should be arranged. For large-scale cement sculpture projects involving high-altitude operations, it is necessary to wear professional safety suits.
金蘭園林景觀,專注于水泥浮雕雕塑的設計與制作,因為更專注,所以更專業,全國擁有眾多案例,并得到客戶的認可。我們的服務,只為懂得藝術的客戶,拒絕平庸,追求卓越,專業、認真、負責,值得信賴,真誠為你,只為您的滿意。
咨詢電話:15978409299
微 信:15978409299
咨詢 QQ:2764182758
官方網站:
微信平臺:jinlancaobihua
博 客:
http://blog.sina.com.cn/jinlancao
公司地址:中國。鄭州東區
商都路與站南路交匯建正東方中
心A座2308室
工廠地址:鄭州市科學大道與淮陽路交匯北500米。